+44 (0)20 8662 2200

Services:

Cost Consultancy and Commercial Advice

Project Description:

The works comprised of:

  • Refurbishment of the existing H-Pod block.
  • Reconfiguration of the existing school reception area and general office areas.
  • Construction of a new build link extension between blocks A and E.
  • Provision of a new externally glazed screen main entrance area.

Back to Primary / Secondary